New “Heavy Lift” Bridge Building Technique in Phillipston, MA

The Patrick-Murray administration’s Accelerated Bridge Program has been in effect for a while here in Massachusetts, updating our infrastructure and creating jobs for thousands of residents.

Here’s a look at some new bridge building techniques that dramatically reduce construction time and get projects from beginning to end faster than ever.

Thanks to the Commonwealth Conversations Transportation Blog for the video and as always head to Wolpert.com for anything else.

[Source]

Advertisements
Published in: on October 18, 2010 at 5:20 pm  Leave a Comment  

The URI to TrackBack this entry is: https://wolpertinsurance.wordpress.com/2010/10/18/new-heavy-lift-bridge-building-technique-in-phillipston-ma/trackback/

RSS feed for comments on this post.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: